Sewer Reticulation
Pipe laying and jointing to gradient, with bedding and surround.
Manholes
Manholes, connection chambers and benching to standard details.
Pump Station Works
Connection works and rising mains to the pump station.
Testing
CCTV inspection, air testing and infiltration testing before handover.
Authority Handover
Submission and liaison through to acceptance and as-built drawings.